PROJECTS

MAGAZINE SUBSTATION

Location: Magazine, Arkansas 

(AEP)

Scope: Installation of (7) piers and (2) breaker pads. Demolition of (2) 60” foundations. Install grounding and below grade conduit. Pull control cable.

634EBB3B-B185-4089-9D8C-E8C3CC0C92CC.heic
IMG_0741.JPG

CROSSTOWN SUBSTATION

Location: Oklahoma City, Oklahoma

(OG&E)


Scope: Place a pad for a telecom pole.

FORT ROBINSON SUBSTATION

Location: Kingsport, Tennessee

(AEP)


Scope: Demo of foundations, placement of new foundations with spread footers, and conduit installation.

IMG_0531.HEIC
IMG_0430.HEIC

CHAMBER SPRINGS SUBSTATION

Location: Siloam Springs, Arkansas

(AEP)


Scope: Placement of all piers, transformer pad, oil containment wall, ground grid system, trenwa, all conduit, and spreading of gravel.

DENVER SUBSTATION

Location: Tulsa, Oklahoma 

(AEP)


Scope: Demolition of 35 piers and a control house.

IMG_1719.HEIC
IMG_2279.HEIC

ROCKY POINT SUBSTATION

Location: Inola, Oklahoma

(AEP)

Scope: Installation of (2) transformers with concrete oil containment wall and liner. Placed Installation of (54) piers varying from 24” to 54”up to 13’ deep and placed (5) breaker pads. Installation of ground grid system and all below grade conduit and stubbed up in their respective location. Installed 240’ of trenwa.

ONETA SUBSTATION

Location: Broken Arrow, Oklahoma

(AEP)

Installed 106 piers, 3 sets of ballistic walls, oil containment system, excavated and installed conduit, installed asset health monitoring system for a transformer, and installed 204 ground rods to the columns. 

4E7AFC56-7807-4E78-B7DB-CE37F9FA04B5.heic
3DFD3529-0F38-48A8-A09C-6FA72AE2B7DD_edited.png

LEGEND SUBSTATION AND GARDEN HILL SUBSTATION

Location: Port Arthur, Texas

(Entergy)

Scope: Installation of all grounding, conduit, and trenwa for new substations.

RED OAK SUBSTATION

Location: Red Oak, Oklahoma

(AEP)

Scope: Installed 103 piers, 8 breaker pads, 1 transformer pad, 1 containment wall, demolition of old foundations, excavated and installed 7,600’ of grounding, excavated/installed 2000’ of conduit, installed 310’ of trenwa, and 7 pull-boxes.

IMG_1268.HEIC
73564032-A62F-4690-B9BC-C5128DB1A169 2.heic

WILKES POWER PLANT

Location: Avinger, Texas

(AEP)

Scope: Demoed 66 foundations, installed 44 piers, 7 breaker pads, 1 AC distribution cabinet, excavated/installed conduit, grounding, installed 250’ of trenwa, and a concrete road crossing.

MCALESTER SUBSTATION

Location: McAlester, Oklahoma

(AEP)


Scope: Installed 40 piers, 3 breaker pads, excavated/installed 2600’ of grounding, excavated/installed 740’ of conduit, installed 165’ of trenwa, 6 pull-boxes, and a fenced gate.

IMG_1182.HEIC
45FD629C-3F2F-4DC2-945B-715937182767_edited.jpg

OKLAUNION SUBSTATION

Location: Vernon, Texas

(AEP)

Scope: Install new transformer pad and oil containment wall.